SearchThree SiteGrid X45 battery energy storage units powered a UK rail tunnel blockade with up to 88% lower fuel cost and 2.56 tonnes of CO2 avoided.
The challenge: round-the-clock power for a rail tunnel blockade
During a 24/7 blockade of a UK rail tunnel to upgrade its overhead power system, the work site was a compound of 28 site cabins and welfare facilities. 120 personnel needed power there around the clock. A temporary compound has no permanent supply, and one generator would put the whole site at risk if it failed. The customer needed a temporary power supply with no single point of failure.
The solution: three battery storage units, each paired with a generator
Think Hire deployed three Panorama-connected SiteGrid X45 battery energy storage units, each paired with a generator in a hybrid setup, to power the 28 cabins and welfare facilities. If one unit became unavailable, the other two could keep supplying power. Panorama resolved 34 issues remotely, without an engineer callout. Think Hire monitors and manages the units remotely through Think Energy Panorama and reports all stats, including fuel, runtime and carbon, to the customer.
The results: 2.56 tonnes of CO2 avoided and up to 88% less fuel cost
In May 2026, the three units together avoided 2.56 tonnes of CO2 emissions against a standard generator. Less generator runtime means less noise, and noise pollution fell by up to 88%. Operating cost, including hire and fuel, fell by up to 59%, and fuel cost fell by up to 88%