Loading...

Cora Homes

Objective

The main requirements were to minimise their impact on the environment and significantly reduce their carbon footprint without impacting site efficiency.

Solution

A Solartainer L to provide power to cabins on the site to reduce cost and environmental impact.

Results

CO2 Reduction 127 Tonnes CO2 Emissions Reduced
Cost Reduction 58% Operating Cost Reduced
Noise Reduction 89% Noise Pollution Reduced
Fuel Reduction 89% Fuel Consumption Reduced

Related Case Studies

Carnell Group & Think Hire: Slashing Highway Emissions by 61%

Carnell Group

Summary

In partnership with Carnell as part of their EcoSite initiative, we successfully deployed Solartainer Versatile, Sitegrid X45 hybrid battery, and Solar Skyframe units across several key highway compound setups in 2023, including high-profile sites like the M69 Ansty and M1 J28 Pinxton Interchange.
Read Case Study
Ashe Group Saves £8,103 & Cuts 22 Tonnes of CO2 with Solar Power

Ashe Group

Summary

At the Journeys Academy development in Potters Bar—a new build school for children with special educational needs—Ashe Group faced a delay in grid connection... Read more
Read Case Study
Bethell & Think Hire: 60% Cost Reduction & 98% CO2 Cut on UK Water Projects

Bethell & Think Hire

Summary

Think Hire is proud to support Bethell in delivering major wastewater capital projects in the North West... Read more
Read Case Study